| Construction of Roads at Adam | Supply of boulders, of various sizes –108,000 m3 | 12/6/2004 | ADAM |
| Construction of Buwa to Fanja Road | Earthworksinclude mountain cutting, rock cutting, filling and leveling and laying, grading and compacting of sub-base. | 12/6/2004 | FANJA |
| Extension to ROP Hospital | Excavation to reduce levels and pit/trench excavation for foundation including disposal of material | 9/12/2004 | QURUM |
| Earthworks at Hill of Center’s Complex at SQU campus | Cut work to a specific level and disposal of surplus material, cut off trees and cart away, earth cutting and cart away unsuitable material, filling with suitable material and compacting. | 16/7/2005 | SQU Campus, Rusayl |
| Commercial Residential building at Alkuwair | Earth work Excavation including disposal of the material off site. –72,000m3excavation volume | 5/12/2005 | Alkuwair |
| Construction of Roads at Wadi Al Ain – Sent | Road excavation including disposal of unsuitable material, borrow excavation to embankment and supply, laying and compacting of sub-base | 9/11/2005 | Wadi Al Ain – Sent |
| Construction of internal roads and car parking lots | Construction of internal roads and car parking lots including earthwork and asphalt. | 20/7/2010 | Alzahra College – Airport heights |
| Tilal Complex-Roads and Infrastructure works | Construction of access roads, walkways, curbstones, slope protection and drainage pipes. | 22/8/2010 | Tilal Complex – Ghubra |
| Leveling of plot at Halban | Leveling working including cutting and filling with imported material at halban | 01/2/2012 | Halban – Barka |
| Road works at Al Qabil | Provide, lay, grade, water and compact Earth work up to asphalt level including base and sub base material to an approved slopes | 2/12/2003 | Al Qabil |
| Road works at Wadi Bani Khalid | Cut open in Jabal area and construction, completion and maintenance of graded road (6000m length) including filling with suitable material. | 2/12/2003 | Wadi Bani Khalid |
| Road works at Al Hadefain – Wadi Bani Khalid | Provide, lay, grade, water and compact Earth work up to asphalt level including base and sub base material to an approved slopes | 8/5/2004 | Wadi Bani Khalid |
| H.M Camp at Wilayat Shinas | Total Earth works including joint junctions, cutting, filling, box culvert, pipe culver, side dressing and leveling up to asphalt level | 17/8/2004 | Wilayat Shinas |
| H.M Camp at Wilayat Rustaq | Total Earth works including joint junctions, cutting, filling, box culvert, pipe culver, side dressing and leveling up to asphalt level | 17/8/2004 | Wilayat Rustaq |
| Refurbishment and extension to Coast Guard | Excavate, Jabal rock cutting (22,900 m3) and load and remove surplus material from site including providing suitable tip | 12/6/2004 | Sidab |
| Earthworks for commercial residential building at Ghubra | Excavation, Leveling, compacting and back filling works | 16/4/2000 | Ghubra |
| Demolishing Villa | Demolishing, foundation excavation, leveling and backfilling of (6) nos. of plots | 10/10/2001 | Madinat Sultan Qaboos |
| Mountain Cutting at Ghala | Mountain Cutting, backfilling, leveling and compacting works. (8,000 m3) | 2/9/1999 | Ghala |
| International shipping agencies | Breaking and removing of mountain | 2/12/2000 | Qurum PDO Heights |
| Moosa Abdul Rahman Hassan | Breaking and removing of mountain | 15/3/2004 | Darsait |
| Mohammed and Qaboos Al Khonji | Breaking and removing of mountain | 8/6/2004 | Waljah – Wadi Kabeer |
| Mountain Cutting and leveling at Russail Industrial area | Mountain cutting and disposal of debris out of site, plot leveling with existing material at site | 25/5/2012 | Russail Industrial Estate |
| Mountain Cutting and leveling at Russail Industrial area | Mountain cutting and disposal of debris out of site, plot leveling with existing material at site and imported material | 20/01/2014 | Russail Industrial Estate |
| Plot Leveling at Misfa | Plot leveling with existing material at site, watering and compaction to required level, providing graded access to plot | 15/04/2016 | Misfa |
| Industrial plot leveling | Plotting with existing material at site, watering, and compaction to required level, providing graded access to plot | 5/03/2017 | Samail Industrial Estate |
| Construction of asphalt access road | Construction of asphalt access road leading to residential buildings in Bausher. | 05/03/2017 | Bausher |
| Installation of Radar and CCTV | Installation of Radar and CCTV of speed and red-light control, with concrete foundation and laying of cables | 14/08/2018 | Ghala |